ARCHIVE 2013 December Integrated Building Information Modelling (BIM) With Supply Chain and Feed-Forward Control

Authors

  • Mojtaba Maghrebi
  • Travis Waller
  • Claude Sammut

Keywords:

building information modelling, supply chain, feed-forward control

Abstract

One of the major causes of delays in construction sites belongs to the delays in delivering materials. This paper introduces the integrated Building Information Modelling (BIM) model combined with a supply chain and a controlling system, along with its efficiency for alleviating the negative effects of delays caused by a lack of materials on construction sites. So, firstly the concept of feed-forward control is discussed as a prevention feature in a monitoring system. Then the integrating BIM model
with a supply chain is introduced. Finally this case study has shown how the enhanced BIM model can incorporate the feed-forward control in order to decrease the risks of delays caused by a lack of materials in construction. Moreover, this case study might be used as a decision support system for managers to prevent a construction site from future delays by providing valuable information about the required materials in advanced.

Author Biographies

Mojtaba Maghrebi

School of Civil and Environmental Engineering, The University of New South Wales (UNSW),
Kensington NSW 2052, Australia, {maghrebi,s.waller}@unsw.edu.au

Travis Waller

School of Civil and Environmental Engineering, The University of New South Wales (UNSW),
Kensington NSW 2052, Australia, {maghrebi,s.waller}@unsw.edu.au

National Information and Communications Technology Australia (NICTA), Sydney, Australia

Claude Sammut

School of Computer Science Engineering, The University of New South Wales (UNSW),
Kensington NSW 2052, Australia, claude@cse.unsw.edu.au

Downloads

Published

2013-12-01